Fees

City of Cottage Grove Permit Fee Schedule

XII. ELECTRICAL PERMITS

A. Residential Per Unit:

(Electrical services are included in these fees)

1,000 sq. ft. or less                                                                                                       $172.00

Each additional 500 sq. ft. or portion thereof                                                            $40.00

Limited energy (new construction only)                                                                     $40.00

Each manufactured home or modular dwelling service or feeder                       $100.00

 

B. Services or Feeders--Installation, Alterations or Relocation:

200 amps or less                                                                                                        $100.00

201 amps to 400 amps                                                                                              $121.00

401 amps to 600 amps                                                                                              $172.00

601 amps to 1,000 amps                                                                                           $265.00

Over 1,000 amps or volts                                                                                           $530.00

Reconnection only                                                                                                         $62.00

 

C. Temporary Services or Feeders--Installation, Alterations or Relocation:

200 amps or less                                                                                                           $80.00

201 amps to 400 amps                                                                                               $121.00

401 amps to 600 amps                                                                                               $172.00

601 amps to 1,000 amps                                                                                            $265.00

Over 1,000 amps or volts                                                                                            $530.00

 

D. Branch Circuits--New, Alteration or Extension Per Panel:

 

(a) The fee for branch circuits with purchase of service or feeder fee:

Each branch circuit                                                                                  $6.00

 

(b) The fee for branch circuits without purchase of service or feeder fee:

                   First branch circuit                                                                                  $75.00

Each additional branch circuit                                                                 $8.00

 

 

E. Miscellaneous--Electrical and Feeder Services Not Included in These Fees:

 Each pump or irrigation circle                                                                $62.00

 Each sign or outline lighting                                                                   $62.00

 Signal circuit(s) or a limited energy panel, alteration or extension  $62.00

 

F. Re-inspection fee:                                                                                                           $80.00/hr.

Each additional inspection over the allowable in any of the above                  $80.00/hr.

Inspections outside of normal business hours (minimum two hours)          $120.00/hr.

Inspections for which no fee is specifically indicated                                        $80.00/hr.

Each additional inspection                                                                                      $80.00/hr.

Additional plan review                                                                                              $80.00/hr.

 Investigation Fee: For commencement of work before obtaining a permit.  Actual Cost

 

XIII. RENEWABLE ELECTRICAL ENERGY SYSTEMS

Permit fees for renewable electrical energy systems. For renewable electrical energy permit applications, see OAR 918-309-0410. For repairs and maintenance of renewable electrical energy systems, See OAR 918-309-0220(5).

 

(a)              (A) 5 KVA or less:                        $100.00

                   (B) 5.01 KVA to 15 KVA:             $121.00

                   (C) 15.01 KVA to 25 KVA:           $172.00

 

(b) For wind generation systems in excess of 25 KVA:

(A) 25.01 KVA to 50 KVA:            $265.00

(B) 50.10 KVA to 100 KVA:          $530.00

(C) For wind generation systems that exceed                                                                                                       100 KVA the permit fee shall be calculated                                                                                                        in accordance with OAR 918-309-0040.

(c) For solar generation systems in excess of 25 KVA:

(A) Each additional KVA over 25 will be charged an additional $8.00 per KVA

(B) The permit charge will not increase beyond the calculation for 100 KVA.

 

(d) Permits issued under this subsection include three inspections. Additional inspections will be billed at an hourly rate.

 

XIV. BUILDING VALUATION DATA TABLE

The current statewide adopted ICC Building Valuation Data Table (effective April 1st annually) is on file in the Community Development Department.

 

Deferred Submittals: The plan review fee for processing deferred plan submittals shall be an amount equal to 65% of the building permit calculated in accordance with OAR 918-050-110(2) and (3) using the value of the particular deferred portion of the project with a minimum fee of $115.00. This fee is in addition to the project plan review fee based on the total project value.

 

XV. MECHANICAL FEE SCHEDULE FOR NEW INSTALLATIONS, ADDITIONS, ALTERATIONS FOR ONE- AND TWO-FAMILY DWELLINGS (PER APPLIANCE)

 

Air Handling Units                                                                $28.60

Air Conditioning                                                                    $40.00

Alteration of Existing HVAC System                                  $28.60

Heat Pump                                                                             $52.25

Install/Replace Furnace (including duct work)

Up to 100,000 btu                                                                 $40.00

Over 100,000 btu                                                                  $47.00

Install/Replace/Relocate Heaters

Suspended, Wall or Floor-Mounted                                    $40.00

Appliance Vent Other Than Furnace                                   $28.60

Dryer Exhaust                                                                          $28.60

Hood                                                                                         $28.60

Exhaust Fan Connected to a Single Duct                            $20.00

Gas Piping: 1 to 4 Outlets                                                      $12.25

Each Additional Outlet                                                              $3.50

Boiler/Compressor                                                                  $28.60

Masonry Fireplace                                                                   $80.00

Wood, Pellet, or Gas Stoves or Inserts Including the Flue $28.60

Other Appliances Not Listed Here                                         $20.00

Residential Mechanical; Minimum Fee                                 $80.00

Mechanical Plan Review Fee                             25% of mechanical permit fee

 

Other Inspection and Fees per Hour:

Re-inspection fee  $80.00

Each additional inspection over the allowable in any of the above $80.00

Inspections outside of normal business hours (minimum two hours) $120.00

Inspections for which no fee is specifically indicated $80.00

Each additional inspection $80.00

Additional plan review $80.00

Investigation Fee: For commencement of work before obtaining a permit. Actual Cost

 

XVI. MECHANICAL FEE SCHEDULE FOR NEW INSTALLATION, ADDITIONS, ALTERATIONS TO COMMERCIAL, MULTIFAMILY, AND INDUSTRIAL PROJECTS

 

VALUATION INCLUDES DOLLAR VALUE OF ALL MATERIALS, EQUIPMENT, LABOR, OVERHEAD AND PROFIT:

Total Valuation            Fee

$0.00 to $500.00         $80.00

$501.00 to $5,000       $80.00 for the first $500.00 and $2.50 for each additional $100.00 or fraction thereof

$5,001 to $10,000       $192.50 for the first $5,000 and $2.50 for each additional $100.00 or fraction thereof

$10,001 to $50,000     $317.50 for the first $10,000 and $2.50 for each additional $100.00 or fraction thereof

$50,001 to $100,000   $1,317.50 for the first $50,000 and $2.50 for each additional $100.00 or fraction thereof

$100,001 and over       $2,567 for the first $100,000 and $2.50 for each additional $100.00 or fraction thereof

 

Commercial Mechanical Minimum Fee $80.00

Plan review equals 25% of the mechanical permit fee.

 

Other Inspection and Fees per Hour:

Re-Inspection fee                                                                                                           $80.00

Each additional inspection over the allowable in any of the above                       $80.00

Inspections outside of normal business hours (minimum two hours)               $120.00 

Inspections for which no fee is specifically indicated                                             $80.00

Each additional inspection                                                                                           $80.00

Additional plan review                                                                                                   $80.00

Investigation Fee: For commencement of work before obtaining a permit.     Actual Cost

 

XVII. PLUMBING PERMIT FEE SCHEDULE FOR NEW CONSTRUCTION, ADDITIONS, ALTERATIONS TO ONE- AND TWO-FAMILY DWELLINGS

 

ONLY INCLUDES THE FIRST 100 FEET FOR EACH UTILITY CONNECTION and hose bibs, icemakers, underfloor low-point drains, and rain drain packages that include piping, gutters, downspouts, and perimeter system; ADDITIONAL SITE UTILITIES ARE PER THE SCHEDULE BELOW:

 

One Bathroom/1 Kitchen                                                                                   $365.00

Two Bathrooms/1 Kitchen                                                                                 $548.00

Three Bathrooms/1 Kitchen                                                                               $639.00

Each Additional Kitchen and/or Bath (1/2 bath counts as full bath)           $152.00

Plumbing Minimum Fee                                                                                         $80.00

 

Other Inspection and Fees per Hour:

Re-inspection fee                                                                                                            $80.00

Each additional inspection over the allowable in any of the above                        $80.00

Inspections outside of normal business hours (minimum two hours)                $120.00

Inspections for which no fee is specifically indicated                                               $80.00

Each additional inspection                                                                                             $80.00

Additional plan review                                                                                                     $80.00

Investigation Fee: For commencement of work before obtaining a permit.        Actual Cost 

 

XVIII. PLUMBING PERMIT FEE FOR NEW CONSTRUCTION, ADDITIONS, ALTERATIONS TO ONE- AND TWO-FAMILY DWELLINGS, MULTIFAMILY, COMMERCIAL AND INDUSTRIAL PROJECTS

 

PREMISES SITE UTILITIES:

Catch Basin/Area Drain $26.50 per fixture

Drywells/Leach Line/Trench Drain $40.00 per fixture

Manufactured Home Utilities $65.00 per fixture

Rain Drain Connections (not applicable on new dwelling construction) $26.50 per fixture

 

**THE FOLLOWING FEES ARE FOR EXTERIOR LINES IN ADDITION TO THE OTHER FEES**

Sanitary Sewer: First 100 Feet                    $81.00

  Each Additional 100 Feet                  $61.00

Storm Sewer: First 100 Feet                        $81.00

  Each Additional 100 Feet                  $61.00

Water Service: First 100 Feet                       $81.00

  Each Additional 100 Feet                  $61.00

Storm Water Retention Tank or Facility      $73.00

 

FIXTURE or ITEM:

Back Flow Device                                                                                  $26.50 per fixture

Basins/Lavatories/Sinks                                                                      $26.50 per fixture

Clothes Washer                                                                                      $26.50 per fixture

Dishwasher                                                                                             $26.50 per fixture

Drinking Fountain                                                                                   $26.50 per fixture

Ejector/Sump Pumps                                                                            $26.50 per fixture

Expansion Tank                                                                                      $26.50 per fixture

Floor Drain/Floor Sink/Hub Drain                                                        $26.50 per fixture

Hose Bib (not applicable on new dwelling construction)                $26.50 per fixture

Interceptor/Grease Trap                                                                        $26.50 per fixture

Tub/Shower/Shower Pan                                                                      $26.50 per fixture

Urinal                                                                                                         $26.50 per fixture

Water Closet                                                                                             $26.50 per fixture

Water Heater                                                                                            $26.50 per fixture

Solar Unit That Is Connected to Potable Water                                  $26.50 per fixture

Water Other Fixtures Not Listed                                                            $26.50 per fixture

 

Plumbing Minimum Fee $80.00

 

Other Inspection and Fees per Hour:

Re-inspection fee                                                                                                                   $80.00

Each additional inspection over the allowable in any of the above                               $80.00

Inspections outside of normal business hours (minimum two hours)                       $120.00

Inspections for which no fee is specifically indicated                                                      $80.00

Each additional inspection                                                                                                    $80.00

Additional plan review                                                                                                            $80.00

Investigation Fee: For commencement of work before obtaining a permit.            Actual Cost

 

XIX. MEDICAL GAS PIPING SYSTEM FEE SCHEDULE

 

Total Valuation                                                         Fee

$0.00 to $500.00                                                      $80.00

$501.00 to $2,000                                                    $80.00 for the first $500.00 and $5.00 for each additional                                                                                               $100.00 or fraction thereof

$2,001 to $25,000                                                     $155.00 for the first $2,000 and $18.00 for each additional                                                                                             $1,000 or fraction thereof

$25,001 to $50,000                                                   $569.00 for the first $25,000 and $14.00 for each additional                                                                                           $1,000 or fraction thereof

$50,001 to $100,000                                                $919.00 for the first $50,000 and $9.00 for each additional                                                                                             $1,000 or fraction thereof

$100,001 and over                                                    $1,369 for the first $100,000 and $8.00 for each additional                                                                                             $1,000 or fraction thereof

Minimum Fee: $80.00

 

Other Inspection and Fees per Hour:

Re-inspection fee                                                                                                                   $80.00

Each additional inspection over the allowable in any of the above                               $80.00

Inspections outside of normal business hours (minimum two hours)                        $120.00

Inspections for which no fee is specifically indicated                                                      $80.00

Each additional inspection                                                                                                    $80.00

Additional plan review                                                                                                            $80.00

Investigation Fee: For commencement of work before obtaining a permit.              Actual Cost

 

XX. PLUMBING PERMIT FEE SCHEDULE FOR MULTIPURPOSE/CONTINUOUS LOOP RESIDENTIAL FIRE SPRINKLER SYSTEMS (13D)

 

Fee is inclusive of Plan Review

 

SQUARE FOOTAGE OF DWELLING

First 2,000 sq. ft.                                              $136.15

2,001 to 3,600 sq. ft.                                        $173.25

3,601 to 7,200 sq. ft.                                        $235.10

7,201 sq. ft. and over                                       $297.00

 

Other Inspection and Fees per Hour:

Re-inspection fee                                                                                                                   $80.00

Each additional inspection over the allowable in any of the above                               $80.00

Inspections outside of normal business hours (minimum two hours)                       $120.00

Inspections for which no fee is specifically indicated                                                      $80.00

Each additional inspection                                                                                                    $80.00

Additional plan review                                                                                                            $80.00

Investigation Fee: For commencement of work before obtaining a permit.              Actual Cost

 

XXI. ONE- AND TWO-FAMILY, MULTIFAMILY, COMMERCIAL AND INDUSTRIAL BUILDING PERMIT FEE TABLE

 

$0.00 to $2,000                                              $85.05

$2,001 to $25,000                                          $85.05 for the first $2,000 and $12.50 for each additional $1,000                                                                                  or fraction thereof

$25,001 to $50,000                                        $372.55 for the first $25,000 and $9.00 for each additional $1,000                                                                                 or fraction thereof

$50,001 to $100,000                                      $597.55 for the first $50,000 and $6.15 for each additional $1,000                                                                                 or fraction thereof

$100,001 to $500,000                                    $905.55 for the first $100,000 and $4.95 for each additional $1,000                                                                              or fraction thereof

$500,001 to $1,000,000                                $2,885.05 for the first $500,000 and $4.15 for each additional                                                                                        $1,000 or fraction thereof

$1,000,001 and over                                      $4,960.05 for the first $1,000,000 and $2.75 for each additional                                                                                    $1,000 or fraction thereof

Minimum Fee: $85.05

 

Other Inspection and Fees per Hour:

1. Re-inspection fee                                                                                                           $80.00

2. Each additional inspection over the allowable in any of the above                       $80.00

3. Inspections outside of normal business hours (minimum two hours)               $120.00

4. Inspections for which no fee is specifically indicated                                             $80.00

5. Each additional inspection                                                                                           $80.00

6. Additional plan review required by changes, additions or revisions to the approved plans (minimum charge, one hour)                                                                                                                              $80.00

7. Prescriptive photovoltaic system installation (inclusive of one inspection)      $150.00

8. Non-prescriptive photovoltaic system installation: Based on valuation as per Structural Permit Fee Valuation Table (includes value for the solar panels including racking, mounting elements, rails and the cost of labor to install. Does not include the electrical equipment such as collector panels and inverters--these shall be excluded from the permit valuation.)

9. Structural Plan Review Fee                                   65 percent of building permit fee

10. Fire and Life Safety Plan Review Fee                40 percent of building permit fee

11. State Surcharge Fee -- Structural                       12 percent of building permit fee

12. Structural Permit Fee Schedule for Standalone Residential Fire Suppression System (13R)--based on the square footage of the structure to be covered by the system--inclusive of plan review:

Square Footage

First 2,000 sq. ft.                                  $136.15

2,001 to 3,600 sq. ft.                            $173.25

3,601 to 7,200 sq. ft.                            $235.10

7,201 sq. ft. and over                           $297.00

 

13. Deferred Permitting: Plan review fee for processing deferred plan submittals shall be an amount equal to 65 percent of the building permit calculated in accordance with OAR 918-050-110(2) and (3) using the value of the particular deferred portion of the project with a minimum fee of $115.00. This fee is in addition to the project plan review based on the total project value.

14. Phased Permitting: Plan review for a phased project is based on a minimum phasing fee plus 10% of the total project building permit fee, not to exceed $1,500 for each phase (minimum fee $200.00).

Investigation Fee: For commencement of work before obtaining a permit.              Actual Cost

 

XXII. TECHNOLOGY FEE

 

The purpose of the technology fee charged by the city is to pay for technology improvements to accommodate e-permitting and other computer related processes. A technology fee will be charged when processing specialty code, structural, plumbing, mechanical, manufactured dwelling, fire and electrical permits, planning and engineering applications, and point of sale items (documents, maps, air photos, etc.). Fees cover only a small part of the cost of technology.

 

Technology Fee:              5% of all permits, applications and point of sale.

 

XXIII. MANUFACTURED DWELLING FEES

 

Manufactured dwelling placement permit fee (includes plan review)                         $300.00

Manufactured dwelling and cabana installation admin fee                                             $30.00

State surcharge--Manufactured dwelling                                          12% of manufactured dwelling permit fee

 

XXIV. MANUFACTURED DWELLING/RE PARK AREA DEVELOPMENT PERMIT

 

The Area Development Fee shall be determined from Table 1 using the valuation for all facilities for which the permit is issued. The fees in Table 1 shall be based on valuation Table 2 or be determined by the applicant with documentation acceptable to the authority having jurisdiction. Permit fees shall be paid to the authority having jurisdiction before any work begins.

 

Table 1

Total Valuation                                            Fee

$1.00 to $500.00                                        $25.00

$501.00 to $2,000                                      $25.00 for the first $500.00, plus $2.20 for each additional $100.00 or                                                                         fraction thereof, to and including $2,000

$2,001 to $25,000                                      $58.00 for the first $2,000, plus $9.90 for each additional $1,000 or                                                                              fraction thereof, to and including $25,000

$25,001 to $50,000                                    $258.70 for the first $25,000, plus $7.15 for each additional $1,000 or                                                                           fraction thereof, to and including $50,000

$50,001 to $100,000                                  $464.45 for the first $50,000, plus $4.95 for each additional $1,000 or                                                                         fraction thereof, to and including $100,000

$100,001 to $500,000                               $711.95 for the first $100,000, plus $3.85 for each additional $1,000 or                                                                         fraction thereof, to and including $500,000

$500,001 to $1,000,000                            $2,251.95 for the first $500,000, plus $2.20 for each additional $1,000                                                                         or fraction thereof, to and including $1,000,000

$1,000,001 and up                                     $3,351.95 for the first $1,000,000, plus $2.20 for each additional                                                                                    $1,000 or fraction thereof

 

Table 2

                               MOBILE HOME PARK VALUATION TABLE

 

                                                                                Spaces per Acre

  4 5 6 7 8 9 10 11 12
Park Class A 5901 5517 5197 4941 4685 4493 4365 4301 4237
Park Class B 5504 5120 4800 4544 4288 4096 3968 3904 3804
Park Class C 5312 5028 4608 4352 4269 3904 3776 3712 3648

 

Class A -- parks contain paved streets, curbs and sidewalks

Class B -- parks contain paved streets, no curbs or sidewalks

Class C -- parks contain no paved streets, no curbs but have sidewalks on one side of each street

 

When a park contains spaces in more than one class, figure the spaces in each class; then add them together to obtain the total valuation for the park.

 

Plan review fee is 65% of permit fee.